Product updates

What’s new in Zaptiz

Features as they reach production. Built-but-not-released work is never listed here.

  1. Zaptiz Construction

    Zaptiz Construction is live

    Our construction ERP is now available at construction.zaptiz.com — BOQ to RA bill on one record, with AI agents built in.

    Zaptiz Construction is now live for Indian contractors.

    • Pre-construction: leads, clients and sites, BOQs with Excel import, rate analysis, quotations and contract award with retention, advance and liquidated-damages terms.
    • Project control: budgets derived from the contract BOQ, a cost ledger that posts itself from POs, GRNs, muster, plant logs and subcontract bills, change orders and a per-project timeline.
    • Procurement and stores: material requests, value-based PO approvals, goods receipts and company and site stores.
    • Site: daily progress reports, labour muster, equipment logs, snags, quality inspections and safety incidents.
    • Billing: RA bills measured against the contract BOQ, retention, GST invoices and a payments register.
    • AI: an assistant that answers from your project data, plus agents for BOQ generation, rate suggestions, procurement, invoice and challan reading, RA bill drafting, cost overruns, productivity, collections, GST and TDS, and a daily site briefing. Agents prepare drafts; people confirm them.
    • Security: two-factor authentication, one active session per user, project-level access and server-side financial privacy.
  2. Zaptiz Electrical

    Document titles, Match to Catalog and a notification inbox

    Rename drafts before they are sent, rescue ₹0 quotation lines in one pass, and catch up on everything in a full notification inbox.

    • Document titles: quotations and other drafts can be given meaningful names; titles freeze once a document is approved or sent.
    • Match to Catalog: re-links placeholder ₹0 lines on a quotation or BOM to real products in your catalogue, so prices come through.
    • Notification inbox: a dedicated page for every alert, with read and unread states.
  3. Zaptiz Electrical

    Fresher prices in photo-based BOMs

    Photo analysis now prefers your latest imported supplier prices and builds tier-correct BOMs.

    • The photo analyser uses the most recent prices from your imported supplier price lists.
    • BOMs created from a photo keep the brand tier you chose — low, mid or premium — on every line.
  4. Zaptiz Electrical

    GSTR-1 preparation and TDS/TCS on invoices

    The GST agent prepares GSTR-1 data, and sales invoices now support TDS and TCS with a register.

    • GSTR-1: the GST agent prepares GSTR-1 figures from your invoices for review. Zaptiz never files returns for you.
    • TDS/TCS: choose TDS or TCS on sales invoices and see them in a TDS/TCS register with CSV export.
  5. Zaptiz Electrical

    A stronger GST invoice engine, Stripe and billing approvals

    GST is computed once at invoice creation and stored with the invoice; Stripe joins Razorpay; plan changes go through a simple approval flow.

    • GST engine: CGST, SGST and IGST are calculated once when an invoice is created and stored with it, with gap-free numbering per financial year.
    • Stripe: connect your own Stripe account for card payment links alongside Razorpay.
    • Billing approvals: plan changes and credit top-ups are submitted as requests and confirmed by the Zaptiz team.
  6. Zaptiz Electrical

    Bulk price editing

    Update hundreds of product prices at once — by percentage, amount, multiplier or margin on cost — with a preview before anything changes.

    • Change prices by a percentage or an amount, set a fixed price, apply a multiplier or a margin on cost.
    • Rounding, floor and ceiling options.
    • A dry-run preview shows every change before you apply it.
  7. Zaptiz Electrical

    CRM upgrade — My Day, contacts, custom stages and campaigns

    A daily task list for sales, a contacts directory with CSV import, your own pipeline stages and email campaigns.

    • My Day: overdue, today and upcoming follow-ups plus open deals with no next step.
    • Contacts: a directory with consent flags, duplicate merge and a guided CSV import.
    • Pipeline stages: rename, reorder and add stages, set win probabilities and flag stuck deals.
    • Campaigns: rule-based email audiences with merge fields, test sends and per-recipient results, sent through your own Brevo account.
  8. Zaptiz Electrical

    Voice for the AI assistant and a rebuilt drawing analyser

    Talk to the AI assistant, and get drawing analysis that matches each line against your catalogue before anything reaches a BOM.

    • Voice: dictate questions, use hands-free mode or have answers read aloud.
    • Drawing analyser: PDF and image drawings are analysed line by line; each line is marked matched, needs review or no match, and only lines you confirm become BOM items.
    • Lead to customer: leads now link cleanly to customers, BOMs, quotations and sales orders.